Jobs
Browse published inspection and audit opportunities from companies using Inspecker.
1281 jobs found
Page 41 / 107
I wanted to share with you the details of the inspection of the Turbine Shaft to be carried out in Italy by our manufacturing subcontractor. This inspection can be carried out on 29.11.2024 or any day after. In this context, I would like to inform you that an external inspector candidate who meets the minimum conditions in our specifications (mechanical engineer, min. 5 years of experience, NDT L2) will be determined for the relevant inspection, his/her CV will be shared with us and approval will be obtained. Technical drawings of the Turbine Shaft subject to the inspection (as 3 compressed files) will be shared later on. Company: Ofar S.p.A Address: Via dell’Industria 5, 25010 Visano (BS) / ITALY Date of inspection: 29.11.2024 + Scope of inspection: Dimensional Inspection, VT, UT Inspections Duration of inspection: 1 day
There will be TAT-296 Diapers Pre-Shipment & Loading Inspection in 136 78 ATHENS / GREECE, on 26-29.11.2024.
There will be a supplier inspection in Ukraine.
There will be a sampling inspection in KARTONBAAN 7, 9672 BP WINSCHOTEN – NETHERLANDS The client wants the inspector to go to this location and witness the sampling according to the standards. The product is stainless steel placed in the PVC Windows. The client bought 2mm, however, when the vendor checked it was 1.2mm.
There will be TAT-295 Diapers Pre-Shipment & Loading Inspection in 136 78 ATHENS / GREECE, on 20-22.11.2024.
There will be HIB-49 Pre-Shipment & Loading Inspection for HDPE Pipes and fittings in Organize Sanayi Bölgesi Mehmetçik Caddesi No:2 Aksaray-TURKEY on 19-20-21.11.2024. 80 Containers.
There will be a Caustic Preparation Unit final inspection in sera-Straße 1, Immenhausen (Deutschland), Baden-Württemberg, Germany, 34376 on 12.11.2024
• Item: Crystallizer supports • Scope: Topographic measurements • Fecha: To be defined • Lugar: Dead Sea, Ghour El Safi, Jordan
There will be AMC.01 Checking the dimension, Zinc Content & Quantity inspection for the Galvanized Sheet in 57 South Gongye Road, Lixia District, Jinan, China on 19.11.2024.
legal regulations review inspection
There will be an inspection for Fine Metal Machining work in Brembilla (BG) Italy. The inspection requirements are; Visual (highly sensitive), dimensions, QTY, and Packing.
There will be a Pre-Shipment & Loading Inspection for ASH.01 FEED MACHINERY AND ACCESSARIES FOR PELLET LINE. The inspection location is Songjiang District, 201613 Shanghai, China. The inspection date is 22.11.2024.
© 2026 Inspecker. All rights reserved.
Inspection marketplace, audit workflows, inspector discovery, and project collaboration.