Jobs
Browse published inspection and audit opportunities from companies using Inspecker.
1268 jobs found
Page 20 / 106
There will be Welded Plate Heat Exchanger Inspection in Rue Jules Verne 58600 Garchizy – FRANCE on 11.09.2025. Requested control steps; • Dimensional Control • Visual Inspection • Helium leak test • Documentation control (including signing relevant control reports and evaluation of NDT applications) • Preparing control report regarding to control items, and signing relevant steps of ITP Minimum required personnel qualification; • Inspector must have minimum 5 years experiences about valves and welding. • Inspector must have CSWIP 3.1 Welding Inspectıon Certification . • Inspector must have Radiographic(RT 2) Certification according to EN 9712
There will be Inlet manifold (land side & sea side) Inspection in Schermbeck – GERMANY on 08.09.2025. Requested control steps; • Dimensional Control before hydrotest • Visual Inspection before hydrotest • Hydrostatic Test • Documentation control (including signing relevant control reports and evaluation of NDT applications) • Final dimensional check after hydrostatic test • Preparing control report regarding to control items, and signing relevant steps of ITP Minimum required personnel qualification; • Inspector must have minimum 5 years experiences about piping and welding. • Inspector must have CSWIP 3.1 Welding Inspection Certification . • Inspector must have Radiographic(RT 2) Certification according to EN 9712
There will be TAT-338 Diapers Pre-shipment & Loading Inspection in 136 / 78 ATHENS, GREECE on 04.09.2025 (6 CONTAINERS).
There will be TAT-339 Diapers Pre-shipment & Loading Inspection in 136 / 78 ATHENS, GREECE on 03.09.2025 (3 CONTAINERS) & 05.09.2025 (3 CONTAINERS).
There will be FAT Witnessing for Transformer and MVS in Coreses, Zamora, Spain for 10 days, starting from next week (01 – 05.09.2025, exact date TBD).
There will be Expansion Valves Inspection in Ludwigshafen am Rhein, Baden-Württemberg, Germany on 15/09/2025-19/09/2025 & 22/09/2025-26/09/2025 (10 days).
There will be NOW.55 – Processed Cheese Slices - Pre-Shipment & Loading Inspection in 14-300 Morąg, Poland on 4th & 5th September 2025 (from 6 A.M. - 8 containers).
There will be TAT-337 DIAPERS Pre-Shipment & Loading Inspection on 29.08.2025 (7 CONTAINERS) in 136 78 ATHENS / GREECE.
Pipe Upsetting inspection, in the inspection project "Manufacturing/fabricating of seamless steel tubing API-5-CT". Alpinestraße 41 8652 Kindberg.
ALKATAŞ Boiler Inspections SUPPLIER - XIZI
ALKATAŞ FEED WATER PUMP Inspections SUPPLIER - SULZER
ALKATAŞ - BOILER STEEL STRUCTURE Inspections SUPPLIER - SHUANGJIA
© 2026 Inspecker. All rights reserved.
Inspection marketplace, audit workflows, inspector discovery, and project collaboration.