Job Name: Vertical Mixer Control - #80002

Create Date : May 24, 2022
C. Monte Potrero, 45, 28500 Arganda del Rey, Spain Spain
Summary - Additional Requirements

After the inspection, 2 reports should be written. 1. Inspection Report 2. Expediting Report Please include the following in expediting report: 01-Provide the update status for each mixer tag no separately. 02-Provide photos for each mixer tag no (no need for general/mix photos). 03-Update the production process as per the attached scheduel. 04-Update the delivery date for balance items. -Expediting and following up the fabrication progress and production status with reference to the received production schedule. -Update the inspection/quality activities status. In the inspection to be made, inspection of the ITP regarding the order on behalf of Client, the general status of the orders, the inspection of the quality documents, the determination of the missing quality documents, the determination of the current status of the production, according to the production calendar you sent to Client, what percentage of the order was completed, what percentage was not completed, etc. determination of the production stage, control of documents related to completed processes, etc. checks will be made. At the end of the audit, an audit report and an acceleration report will be prepared to be reported to Client. Every page of the documents must be certified when the inspector comes to the inspection. The inspector will also approve the documents approved by you. 1. Contract ( Client and Supplier ) 2.Technical Specification ( Client and Supplier ) 3. Quality and test plan (ITP) ( Client and Supplier ) 4. Technical Drawings ( Client and Supplier ) Suppleir; 5. Certificates of company qualification documents 6. Material and Equipment list and 3.1-3.2 Certificates 7. Material traceability records and markings 8. Consumables list and certificates 9. Machine list and calibration certificates 10. Resource attributes (WPS, WPQR) 11. Welding personnel list and Certificates (WQT) 12. Cutting/Bending etc records 13. Resource log and resource plan 14. Visual inspection and Size/dimension control reports 15. NDT personnel list and certificates 16. NDT plan 17. Tightness and strength test records 18. Coating records 19. Measurement equipment calibration certificates etc.

Information: The inspection project description is shown to the extent specified by the company official. After submitting your offer, you can request the details again from your dashboard.

Job Budget ( $ accepts currency. RFQ (Request for quotation) ):
Target price was not specified. Please submit your total hourly rate when responding to this job.

Start Date :

May 24, 2022

Due Date:

May 24, 2022

Bugdet :

Unspecified

Status :

Inprogess
Listof applicants for the proposal
HB
H**** B*****

Inspector

***

Projects

***

Tasks

AS
A**** S****

Inspector

***

Projects

***

Tasks

Type
Extensive Quality Audit

Category
treatment Plant Equipment

Group
Vertical Mixer

Time
One Time

Location

The qr code is the detail of the job. Share it or use it in your reports.