Inspection location: Taiyuan Yuci District Taichong Hydraulic Industrial Park Scope: 1. Check the Material Certificate, 2: welding quality, and certificate, 3. Check the Tank leakage test report, 4. Check the Purchase component certificate, 5. Dimensional and Assembly check, painting inspection Acc. to 347180OQC010014_Rev.A (Color, Thickness, Coating), 6. Check the function test reports (Motor, pump, pressure test, static seal test, tank, accumulator), 7. Visual and final check, Sign the FFIC (Final Factory Inspection Certificate)
Information: The inspection project description is shown to the extent specified by the company official. After submitting your offer, you can request the details again from your dashboard.
Start Date :
Due Date:
Bugdet :
Status :
The qr code is the detail of the job. Share it or use it in your reports.