Pump Inspections - France
Job #11091Summary & additional requirements
There will be Pump Inspections in Longvic, Cedex – FRANCE for 12 days, starting from 27.10 to 12.11.2025. Inspection Details: Inspections to be conducted on Pumps, manufactured according to API 610 standard, for 12 days. Inspection Plan: • 27/10/2025 - 31/10/2025 - Monday to Friday → 5 days • 03/11/2025 - 07/11/2025 - Monday to Friday → 5 days • 10/11/2025 & 12/11/2025 - Monday/Wed. → 2 days Note : 11/11/2025 End of 1st World War public Holiday Total: 12 days Scope of Inspection: 1-) Section 3. PUMP CASE & SEAL HOUSING PIPING KITS INCLUDING PORT 2&7, API Plan 11 and Drain: Hydrostatic test with wetting agent (Pump case, Seal Housing & welded kits) (W); 2-) Section 9. BARE UNIT TESTING Performance test, Vibration measurement, NPSH & FFT spectrum (with shop accessories) ( W) Extended Mechanical run test with shop motor and shop coupling 4 hours (MRT) ( W) 3-) Quality documentation ( R) *Material certificates *Welding consumables certificates *RT Film evaluations *Weld log checks *NDT report checks (RT, PMI, PT/MT, etc.) *Quality file checks Inspector Requirements: * Must have a minimum of 5 years of experience in rotating equipment inspection. * Must be knowledgeable about the API 610 standard. * Must be EN ISO 9712 RT and PT or MT certified. * Must be CSWIP 3.1 or CSWIP 3.2 certified.
Information: The inspection project description is shown to the extent specified by the company official. After submitting your offer, you can request the details again from your dashboard.
Target price was not specified. Please submit your total hourly rate when responding to this job.
- Start date
- Oct 27, 2025
- Due date
- Nov 12, 2025
- Budget
- Unspecified
- Status
- Published