There will be Pump Inspections in Longvic, Cedex – FRANCE for 12 days, starting from 27.10 to 12.11.2025. Inspection Details: Inspections to be conducted on Pumps, manufactured according to API 610 standard, for 12 days. Inspection Plan: • 27/10/2025 - 31/10/2025 - Monday to Friday → 5 days • 03/11/2025 - 07/11/2025 - Monday to Friday → 5 days • 10/11/2025 & 12/11/2025 - Monday/Wed. → 2 days Note : 11/11/2025 End of 1st World War public Holiday Total: 12 days Scope of Inspection: 1-) Section 3. PUMP CASE & SEAL HOUSING PIPING KITS INCLUDING PORT 2&7, API Plan 11 and Drain: Hydrostatic test with wetting agent (Pump case, Seal Housing & welded kits) (W); 2-) Section 9. BARE UNIT TESTING Performance test, Vibration measurement, NPSH & FFT spectrum (with shop accessories) ( W) Extended Mechanical run test with shop motor and shop coupling 4 hours (MRT) ( W) 3-) Quality documentation ( R) *Material certificates *Welding consumables certificates *RT Film evaluations *Weld log checks *NDT report checks (RT, PMI, PT/MT, etc.) *Quality file checks Inspector Requirements: * Must have a minimum of 5 years of experience in rotating equipment inspection. * Must be knowledgeable about the API 610 standard. * Must be EN ISO 9712 RT and PT or MT certified. * Must be CSWIP 3.1 or CSWIP 3.2 certified.
Information: The inspection project description is shown to the extent specified by the company official. After submitting your offer, you can request the details again from your dashboard.
Start Date :
Due Date:
Bugdet :
Status :
The qr code is the detail of the job. Share it or use it in your reports.