There will be an Electrification Material Inspection in Houston, Texas, 77338, USA. The inspection date will be forwarded soon. Submission deadline for this inquiry is 28.10.2025. Inspection Material: Electrification Material For Oil Wells Inspection Scope: level 1 inspection (pre-shipping) A Level 1 inspection Release or shipment inspection. This level requires only final inspection to release material or equipment for shipment. (Ensure complete equipment and/or material is in accordance with the purchase order; is properly identified; is adequately prepared for shipment and, those documentation requirements have been fulfilled). This will include final system check (FAT) Factory Acceptance Test.
Information: The inspection project description is shown to the extent specified by the company official. After submitting your offer, you can request the details again from your dashboard.
Start Date :
Due Date:
Bugdet :
Status :
The qr code is the detail of the job. Share it or use it in your reports.