There will be an Electrification Material Inspection for Oil Wells in New Industrial Area, Doha, Qatar. Quoted delivery is 15.03.2026. Commodity: Wellhead & X-Mas Tree Assemblies - Oil Wells Scope of Inspection: level 3 inspection ((Full Scope)) Full scope Inspection: This level requires the same periodic activities as LEVEL 2 (which is as follows: requires a pre-fabrication visit, to review quality requirements established in the purchase order, plus coverage of all Witness and Hold Points). Also includes "Review for Shipment Inspection" - final inspection to release materials or equipment for shipment. In addition, the inspector will plan random visits during equipment fabrication to monitor Seller's work and adherence to established procedures and purchase order requirements. The frequency of the random visits will be based on the complexity of the equipment and the Seller's performance. And includes: • Pre-Inspection Meeting • Review of QCP, MPS, and manufacturing documents • Witnessing of all manufacturing, testing, and inspection activities • Final visual and dimensional checks • Verification of operator qualifications • Full supervision of packing and loading.
Information: The inspection project description is shown to the extent specified by the company official. After submitting your offer, you can request the details again from your dashboard.
Start Date :
Due Date:
Bugdet :
Status :
The qr code is the detail of the job. Share it or use it in your reports.